Page 11 - MSE-walls-crimplock_5x10

Basic HTML Version

10
Material, Tools and Equipment
Required by Contractor
• Excavation Equipment
• Leveling Course Formwork
and Concrete
• Crane, Picker or Boom Truck
• Cable and Sling Rigging
• Survey Instrument
• Chalk Line, Level, Plumb Bob
• Wooden Wedges, Pry Bars
• Select Backfill Material and
Placement Equipment
• Small Vibratory Roller
• Joint Clamps and Bracing
• Hammer Drill and Concrete Bits
• Miscellaneous Small Tools
Materials Supplied with the
Tricon Retained Soil Wall System
• Precast Concrete Fascia Panels
• Panel Alignment Shims
• Panel Bearing Pads
• Filter Fabric and Adhesive
• Soil Reinforcement Mats
• Connection Locking Rods
• Panel Lifting Devices (1 set)
TM